简体中文 | ENGLISH | ISO


 


The announcement of KCC-2008-108 file on August 7, 2007, the Korea Communications Commission announced (KCC, Korea Communications Commission) to replace the previous South Korean Ministry of Information and Communication (MIC, Ministry of Information and Communication). KCC certification is the mandatory certification for telecommunications equipment and products based in Korea "Telecommunications Basic Law" and "Radio Wave" implementation. Korea Communications Commission is responsible for the management of telecommunications products, which authorized the RRA(Radio Research Agency) for certification bodies, for the implementation of specific product certification. KCC certification is certified by the previous MIC certification accredited laboratory for conformance testing of Korea, issued approval certificate issued by the RRA.

KCC was renamed MSIP (Ministry of Science, ICT & Future Planning) according to the latest Korean regulations KCC.

KC label

The specific content of the new regulations of KCC mark:
1, Begin with MSIP instead of KCC of the KCC certificate / registration number from the original .
2, Starting from 1 July 2,2013, Submission of applications to the NRRA, the system automatically generates MSIP-XXX-XXX-XXXXXXXXXXXXXX form named in the certificate / registration number.
3, Labels which contained KCC-XXX-XXX-XXXXXXXXXXXXXX form naming certificate / registration number of the certificate which had been obtained before July 1st2013, can be used until 30 September 2013.
4, Products shipped to South Korea after October 1st,2013 must use label in the form of MSIP-XXX-XXX-XXXXXXXXXXXXXX.

KCC证书号码解析
 
①The first four codes are MSIP : Ministry of Science, ICT & Future Planning
②Authentication type 

Authentication type Indicating
Certification C
Registration R
Interim I


③Test section

Test section Indicating
Radio R
Telecommunication T
Electromagnetic E
Mixer M


④Application type 

Application type Indicating
Manufacture M
Import I
Sale S


⑤Applicants ID:. Three-digits code consists of English letters or numbers; the first time applicant do not have the Company ID,  which will be generated and permanently represent the applicant after applying for KCC.
⑥Product ID: Self-encoded by the applicants , among which can use letters, numbers or link sign "-", up to 14 digits maximum.

KC labeling requirements
Product labels can be resized with the product, but the height should not be less than 5mm, unless the product size is very small, such as: storage device, etc ... which can be able to adjust the height.
Label Color: basic KC LOGO color is indigo.
If there are special reasons for not using Indigo, you can use the following colors (gold, silver, and black).
Gold/ Silver can be used with a special glow / shiny printing results, or any monochrome.

 

Application requirements

Type ITE device (EMC)
Authority RRA
Certification method EMC Registration
Local representative request No
Local testing request Yes
Lead time 3~4weeks
Sample q’ty at least 1 set
Basic Files AGC Application form
Korean User Manual
Schematic Diagram
Black Diagram

 

Type RF &Telecom device
Authority RRA
Certification method Type approval
Local representative request No
Local testing request Yes
Lead time 4~5weeks
ample q’ty at least 2 sets
Basic Files AGC Application form
Korean User Manual
Schematic Diagram
Black Diagram
PCB Layout & PCB Location
BOM/Parts List
Business license for application and manufacturer
Antenna Specification (Include model name, air line, gain, pointing, characteristic, manufacturer, manufacturing country, partial wave character, radiation pattern, etc.)
Channel List
Modulation,Nomodulation Program, Operating instructions
Test program

 

Safety Approval

Authority MIC
Local representative request No
Local testing request Yes
Lead time CB report for 4~5 weeks (excluding work inspection) No CB 5~7 report week (excluding workers)
Sample q’ty at least 2 sets
Basic Files AGC Application form
Korean User Manual
Schematic Diagram
Black Diagram
PCB Layout & PCB Location
BOM/Parts List
Remark 1, the need for factory audit;
2, the control products are all used for the 50V~1000V and AC power supply of electrical products


Services